Tunis–Sfax Highway Corridor
Geotechnical investigation and foundation design for an 85 km highway corridor including bridge abutments, embankments, and retaining structures.
The Challenge
The corridor traverses highly variable ground — from soft coastal alluvium in the north to expansive clays and karstic limestone in the central section. Differential settlement risk was a primary concern for both the road embankments and the 14 bridge structures along the route.
Our Approach
Alsaad conducted a phased investigation programme comprising 120 boreholes, 45 cone penetration tests (CPT), and a comprehensive laboratory testing schedule. Geophysical surveys were used to map karst features ahead of drilling. Settlement analyses and slope stability modelling informed the embankment design, while pile load testing validated the foundation design for the bridge abutments.
Outcome
The investigation data underpinned a value-engineered foundation solution that reduced the original piling programme by 18%, delivering significant cost savings without compromising safety. Construction supervision services were provided throughout the 30-month build programme.
Services Delivered
- Geotechnical Investigation
- Laboratory Testing
- Foundation Design
- Construction Supervision